Rooftop solar · Storage · EV · Wind — one delivery team
Rooftop solar EPC

Maximizing ROI & Sustainable
Power Output.

Rooftop arrays engineered for maximum yield per square metre — and for the twenty-five years after commissioning.

4.2Yr
Avg. payback
ROOFTOP · 850 kWpGRID SYNCHRONISED

Slide 1 of 4: Rooftop solar EPC

Our solutions

We build the entire energy spine.

01

Solar Rooftop EPC

Turnkey rooftop EPC for factories, warehouses, housing societies, and institutions — structural survey through net-metering and grid synchronisation.

  • Structural load survey
  • Design · supply · install
  • Net metering & liaison
  • Monitoring + O&M
Explore Solar
02

Battery Storage

Lithium storage sized against your actual load curve — riding through outages, shaving peak tariffs, and holding solar generated at noon for the evening peak.

  • Load-profile sizing
  • LFP packs + BMS
  • Peak shaving control
  • Backup changeover
Explore Storage
03

EV Charging

AC and DC charging for commercial forecourts, fleet depots, and residential complexes — load management, OCPP billing, and the civil work to carry it.

  • AC & DC fast charging
  • Fleet depot charging
  • Load balancing
  • Billing integration
Explore Charging
04

Wind Power

Small and medium wind installations, and hybrid wind-solar plants that use one grid connection to hold output steady well past sundown.

  • Wind resource study
  • Turbine foundations
  • Hybrid wind + solar
  • Grid interconnection
Explore Wind
Our Process

End-to-End Energy Flow.

From initial analysis to long-term performance monitoring, we've got you covered.

Power Optimized

DC Conversion.

With advanced technology, we minimize losses and maximize the efficiency of your solar energy system.

Maximum EfficiencyMinimal Energy Loss
SYSTEM EFFICIENCY
99.2%
Performance
Performance matrix

Delivering measurable
macro impact across India
through renewable
infrastructure.

0+
Years experience
0+
Projects completed
0MW
Capacity deployed
Interactive model

Your Solar
Investment.

Calibrate the parameters below to project your potential savings, required system size, and long-term break-even timeline.

Your Details

₹25k
₹5k₹2.00L
₹8.5
₹4₹18
3.0k sq ft
500 sq ft50.0k sq ft
5.5 h
3.5 h7.5 h
82%
60%95%
System Size
30kW
Monthly Savings
₹25k
Annual Payout
₹3.00 L
Payback Period
6Yrs
25-Year Savings
₹57.00 L
CO₂ Offset
48.0T/yr
25-Year Cost Comparison
38L75L113L150L0510152025break-even · yr 6
With SolarWithout Solar
Core values

What we stand for.

Committed

We are in it for the long haul. We adhere to our commitments and deliver on our promises.

Reliable

We are a trusted partner. We bring technical excellence and financial strength to every project.

Flexible

We adapt to challenges. Our hands-on approach allows us to find solutions where others see obstacles.

Human

We value relationships. We treat homeowners, partners, and crew with respect and integrity.

Our ecosystem

Trusted by Global Leaders.

UPNEDA empanelled
Machine insurance Partner
Engineering Partner for Utility scale project
Gov Lending Bank Partner
NBFC Loan partner for Quick Loan
Green Building Certification
IAA Association Solar Business
FAQs

Everything teams ask before signing.

We handle residential, commercial, industrial, and utility-scale solar projects along with energy storage and EV charging solutions.

Yes — a dedicated site engineer is assigned from mobilisation through commissioning, with daily progress updates and a single point of contact throughout.

Rooftop projects: 8–12 weeks. Utility-scale 1–10 MW: 4–6 months. Above 10 MW: 6–12 months depending on land, permits, and grid synchronisation windows.

Every plant carries a 25-year performance guarantee, standard equipment manufacturer warranties, and a workmanship warranty on all civil and electrical installation work.

Every plant is fitted with SCADA and remote monitoring. We provide annual yield reports, and underperformance triggers a service visit within 72 hours.

NABCEP certified, UPNEDA empanelled, IGBC Green Building partner, IAA Association member. All projects meet IEC 61215, IEC 61730, and applicable CEA / DISCOM standards.

Engineer your power output.

Let's power a sustainable future—together.